Every software project starts with someone saying “let’s keep it flexible.”
It sounds safe. It sounds modern. It sounds free. It isn’t. Flexibility is one of the
most valuable things you can buy in software development, but it is bought, not given.
The real question is never “flexible or rigid?” It is:
which flexibility do we need, where, and who pays for it?
The short answer
Someone always pays for flexibility.
Flexibility is paid for in budget, in schedule, in code complexity, or in the predictability
of the result. This article looks at what flexibility actually costs, why unbounded flexibility
is one of the main reasons software projects overrun, how AI tools change the equation, and how
a structured method such as the PYES method turns flexibility from a
hidden liability into a deliberate design choice.
Four kinds of flexibility
Four kinds of flexibility, four different bills.
“Flexible” means different things to different people in the same meeting. A client
usually means one thing, a developer another, and a project manager a third. Each kind has its
own price.
Kind of flexibility
What people mean
Who pays, and how
Scope flexibility
“We can add or change features along the way.”
The budget and the schedule: every change reopens the estimate.
Schedule flexibility
“There’s no hard deadline, we’ll see.”
Focus: work expands, decisions get postponed, value arrives later.
Architectural flexibility
“Build it so it can handle anything later.”
The codebase: extra abstractions and options that must be maintained forever.
Configurability
“Let users set it up however they want.”
Testing and support: every option multiplies the combinations that can break.
None of these are wrong. They are trade-offs. Trouble starts when a project picks all four at
once, implicitly, without anyone writing down what they cost.
Evidence
What the numbers say.
Uncontrolled flexibility is not a theoretical risk. It shows up in decades of project data.
Overruns are the norm for large IT projects. Research by McKinsey and the University of Oxford on more than 5,400 IT projects found that large ones run 45% over budget and 7% over time, while delivering 56% less value than predicted. Every extra year of planned duration increased cost overruns by 15% (McKinsey).
Scope creep affects about half of all projects. PMI’s 2018 Pulse of the Profession found that 52% of projects completed in the previous 12 months experienced scope creep or uncontrolled scope changes, up from 43% five years earlier (PMI).
Requirements change is a constant, not an exception. As early as 1979, Barry Boehm reported that IBM’s Santa Teresa organisation saw an average 25% change in requirements during development (Requirements Economics, arXiv).
Early estimates are inherently wide. Steve McConnell’s Cone of Uncertainty puts estimates at the initial-concept stage anywhere between 0.25x and 4x the final outcome. The cone only narrows when decisions are actually made (Construx).
The pattern is clear. Change is inevitable. What differs between projects is whether change is
managed, or simply allowed.
Consequence 1
Open scope turns estimates into wishes.
An estimate is only as good as the scope it describes. When scope is “flexible,” the
estimate silently becomes a guess about a moving target.
This is where many budget conversations go wrong. The client hears a number and remembers it.
The scope behind that number keeps changing. Months later, both sides are disappointed: the client
because the price went up, the supplier because every “small change” was absorbed
without being priced.
Estimates lose their meaning. A range was given for scope A. The team is now building scope A + B + half of C.
Priorities blur. If everything can still change, nothing is truly decided, and the team keeps re-planning instead of building.
Projects get longer, and longer projects overrun more. The McKinsey data above shows overruns grow with duration. Open scope is one of the easiest ways to stretch duration.
Adding people rarely rescues it. Brooks’s law, from The Mythical Man-Month (1975), states that adding manpower to a late software project makes it later, because of ramp-up time and communication overhead (Wikipedia).
Scope flexibility is valuable early, while you are still learning. It becomes expensive once the
plan has been approved and work is underway, unless each change is consciously weighed and priced.
Consequence 2
“Future-proof” software has a cost of carry.
The opposite reflex is just as common: “Let’s build it so it can handle anything we
might need later.” Extra configuration layers. Generic engines. Settings for situations that
haven’t happened yet.
Martin Fowler calls these presumptive features and lists what they cost
(martinfowler.com):
Cost of build: the analysis, coding and testing of something nobody has asked for yet.
Cost of delay: that effort pushes back the features that would deliver value now.
Cost of carry: the extra code sits in the way of every later change, making the software harder to read, modify and debug.
Cost of repair: if the guess was wrong, the feature has to be reworked or removed when the real requirement arrives.
Fowler’s first argument is simple: when we think we will need a presumptive feature, we are
likely to be wrong. And even when we are right, we pay the cost of delay and carry.
There is an important nuance. YAGNI (“You Aren’t Gonna Need It”) targets
speculative features. It does not argue against making software easier to change: clean
structure, tests and clear boundaries. That distinction is the key to doing flexibility right.
Invest in changeability, not in guesses.
Consequence 3
Late change is cheaper than it used to be, but not free.
The classic cost-of-change curve, based on Barry Boehm’s research, says a change gets
dramatically more expensive the later it is found. An article from Mountain Goat Software argues
the curve is now much flatter than most people assume
(Mountain Goat Software).
Better tools, automated testing, continuous integration, modular architecture and AI assistance
have all made changing code cheaper.
That is good news. But look at what the same article says still makes change expensive:
understanding what users really need;
the delay before you learn whether something works;
slow organisational approvals and decisions;
misunderstanding users, which costs extra iterations.
Notice that none of these are about typing code. They are about knowledge and
decisions. Code has become cheap to change. A wrong assumption about how a business
operates has not. In industrial and made-to-order environments, a late discovery that “this
order type actually works differently” still ripples through data models, calculations,
documents and workflows.
So modern tooling lowers the price of flexibility. It does not abolish it. The bill simply moves
from the code to the understanding behind it.
Consequence 4
AI makes change cheap, and that is exactly the risk.
AI coding tools have changed the economics of flexibility more than anything since agile. Code that
took a day can now take an hour. It is tempting to conclude that flexibility is finally free: if a
decision turns out wrong, just regenerate it.
The evidence says otherwise. AI lowers the cost of producing code. It does not lower the
cost of deciding, understanding or maintaining it. In some ways it raises them.
Perceived speed is not measured speed. In a randomised controlled trial by METR, 16 experienced open-source developers completed 246 real tasks in their own repositories. With AI tools allowed, they took 19% longer, while beforehand they forecast AI would make them 24% faster (METR).
More throughput, less stability. Google’s 2025 DORA report found that about 90% of respondents use AI at work. AI adoption is now linked to higher delivery throughput, but it still has a negative relationship with delivery stability (Google Cloud). In 2024, DORA estimated a 7.2% drop in delivery stability for every 25% increase in AI adoption (Google Cloud).
Cheap code still has a cost of carry. GitClear and GitKraken analysed 623 million code changes from 2023 to 2026. AI-assisted commits made up a quarter of all commits, code duplication rose 81% and reuse fell 70% compared with pre-AI times (LeadDev). This is research by a code-analytics vendor, so read it as an indication rather than proof.
What this means for flexibility:
Cheap change invites more change. When every request “only takes an AI prompt,” scope moves faster than ever. The bill moves to testing, integration, data and the people who have to understand the result.
“Future-proof” features become almost free to build, and just as expensive to carry. Fowler’s cost of build shrinks; the cost of carry and repair does not. Generating speculative options is now the easiest mistake to make.
Estimates get more optimistic, not more accurate. If developers themselves misjudge AI’s effect by over 40 percentage points, plans built on gut feeling about AI speed-ups are fragile. Estimate against scope and evidence, not against hype.
Change control matters more, not less. When output rises and stability falls, the explicit decision moment before a change is what keeps a fast team from becoming a fragile one.
AI makes software faster and less expensive to produce, but businesses still need process analysis,
architecture, secure integrations, validation and accountability for important operational systems.
In other words: AI speeds up Engineer. It makes Profile and Yield more important. Read more in
Is custom software still relevant in the AI era?
The balance
Rigidity has consequences too.
None of this is an argument for freezing everything. A plan that cannot adapt is just a slower way
to build the wrong thing. Businesses change, markets change, and the software has to follow.
The PYES Scale phase puts the balance well:
“Too little control creates instability. Too much control blocks useful adaptation.”
So the goal is not less flexibility. It is bounded flexibility:
flexible where uncertainty is real, and decided where it is not;
flexible at defined moments, not continuously and silently;
flexible with a visible price tag, so every change is a choice rather than an accident.
The PYES method
How the PYES method bounds flexibility.
The PYES method (Profile, Yield, Engineer, Scale) does not try to eliminate
change. It decides where change belongs, and makes its price visible before it is paid.
The PYES method optimises for fit.
Scope boundaries, assumptions and trade-offs are made explicit; delivery estimate ranges come with dependency notes; the roadmap is formally approved before engineering.
Each increment gets its own scope and acceptance criteria; modular architecture lets the platform grow without a full rebuild.
01
Spend flexibility early, where it is cheap.
Most internal software projects fail long before code quality becomes the issue, because they
automate an assumed workflow rather than the real one. Skipping or rushing
Profile shifts complexity downstream, where fixes cost more.
02
Make every later change a decision, with a price.
In PYES, any material scope, architecture or cost-impacting change after
Yield requires explicit approval before implementation.
Change is still allowed. It just can’t sneak in. These change-control rules let the architecture
evolve without collapsing delivery predictability.
03
Put structural flexibility in the architecture, not in speculative features.
PYES builds in modules, each covering one
business capability, which can be upgraded, swapped or extended independently. That is changeability,
not guesswork: you don’t build tomorrow’s features today, you make sure tomorrow’s
features have a clean place to land.
Nothing ships without your sign-off, and nothing is hidden inside a process you can’t see.
Checklist
A practical checklist.
Before you say “let’s keep it flexible” on your next project, ask:
Which kind of flexibility do we mean? Scope, schedule, architecture or configurability? Name it.
Where is the uncertainty real? Keep options open there. Decide everything else.
When is the last good moment to change this? Plan the decision before that moment, not after.
What does a change cost after approval? Agree on a change-control rule before work starts, not during the first argument.
Are we building for a known need or a guess? Invest in clean structure and modular boundaries; postpone speculative features.
Is the estimate tied to a written scope? If the scope moves, the estimate must be revisited openly.
Who decides, and how fast? Slow approvals make change expensive even when the code is easy to change.
Are AI speed-ups in our plan measured or assumed? Use AI to build faster, but keep scope, review and change control as strict as before.
Conclusion
Choose your flexibility on purpose.
Flexibility is not a virtue in itself. It is a resource with a price. Unbounded, it erodes estimates,
stretches timelines and fills codebases with features nobody needed. Absent, it produces software that
fits the business of two years ago. AI tools amplify both sides: they make change faster to build, and
just as easy to build without thinking.
The projects that succeed treat flexibility as a design decision: spent early on understanding, made
explicit when scope is approved, and built into the architecture rather than into guesses.
Flexibility has consequences. The only question is whether you choose them, or they choose you.
Planning custom software for your operation?
Start with a Profile of how your business really runs, and a plan that keeps change under control.
No. Flexibility is valuable, but it always has a price in budget, schedule, code complexity or predictability. The goal is bounded flexibility: keep options open where uncertainty is real, decide everything else, and make the cost of every change visible before it is approved.
Change is still possible, but it cannot slip in unnoticed. Any material scope, architecture or cost-impacting change after the Yield phase requires explicit approval before implementation, so its effect on cost and timeline is clear before work starts.
AI makes producing code faster and cheaper. It does not remove the cost of deciding what to build, understanding the business, testing, integrating and maintaining the result. Research such as the METR productivity study and Google's DORA reports shows that perceived speed gains and delivery stability do not automatically follow from AI adoption.
Invest in changeability, not in guesses. A modular architecture with clean boundaries makes future changes easier. Building speculative features for needs that may never arrive adds cost of build, delay, carry and repair.
At the concept stage, too many decisions are still open. Steve McConnell's Cone of Uncertainty puts early estimates anywhere between 0.25x and 4x the final outcome. Estimates only become reliable as scope is decided, which is why PYES produces estimate ranges with dependency notes during Yield, before engineering starts.